Rudheath Primary School | Northwich

Located in Northwich, Rudheath Primary Academy operates with an ethos of “inspiring minds, building futures”, doing so by providing educational environments which inspire fun and engagement with learning.

During the summer holidays, the school needed to refurbish their existing toilet block to bring it in line with its other recently renovated washrooms. Concept Washroom, as a supplier of products to Washroom Fit-Out Company (WFC) to complete the installation, had a crucial role to play in ensuring the space would be welcoming, safe and practical for the students – all in time for when they returned.

SECTOR:

AREA:

Northwich

CLIENT:

Washroom Fit Out Company

PRODUCTS:

Force Cubicle System, CGL Duct Panels, Solid Surface Wash Troughs

COLOURS:

Rouge Cerise

Zeste De Citron

Bleu Turquoise

Cyclamen

Noisetier Naturel

The Solution

Working closely with WFC, our team suggested the ideal suite of products and solutions to complete the project. 

Key recommendations were made around adopting a vibrant colour to create the desired rainbow effect, as well as products which were suitable for educational environments – as well as being bright and vibrant, the washroom had to be impact resistant and robust enough to handle consistent daily use. 

After agreeing on a solution, we supplied all the products required to complete the installation.

These included full height Force Privacy Cubicles, chosen first and foremost for their aesthetic flexibility and durability qualities. In terms of colours, the six cubicles are finished with Polyrey’s Rouge Cerise (R036), Vinyle (V014), Zeste De Citron (Z016), Vert Bali (V109), Bleu Turquoise (B119) and Cyclamen (C189) so they each represent their own section of the rainbow. The outer cubicles and pilasters were finished in Polyrey Noisetier Naturel (N056).


For the handwashing area, WFC opted for Concept’s integrated plumbing system and laminate Duct Panel System, an aesthetic option to conceal the cistern work which also allows easy access for maintenance. Sleek, white wash troughs in Corian Glacier White replaced the old sinks and sit atop of the CGL under panels. This complements the troughs visually and can be easily removed to enable access to the pipework inside. 

The finer details were also considered, with Powder Coated Matte Black Ironmongery used for the fittings. 

All products were delivered on time to enable the project to be completed before the start of term. The end result is a transformed washroom which reflects the previously renovated facilities – aesthetically attractive and built to last.

“Working with Concept on this project has been a seamless process from start to finish. As well as recommending products which ticked all the boxes for the school, the team has been able to deliver to a tight timeline with minimal fuss.”

Adam Chew, Director at Washroom Fit Out Company

washroom solutions

Related Products

BY PRODUCT RANGE

Cubicles
Vanities
Troughs
Duct Panels
Superloos
Accessories

BY PRODUCT name

Cubicles
Vanities
Troughs
Duct Panels
Superloos
Accessories

Cubicles
Vanities
Troughs
Duct Panels
Superloos
Accessories

SAMPLES

Cubicles
Vanities
Troughs
Duct Panels
Superloos
Accessories

  • Sectors
  • Resources